home | website map | chinese
 
Drilling technology
Completion technology
Downhole operation technology
Drilling tool service and tubular manufacture
Research and Design
 
 
  home > Products and Services > detail
ADYJ Loss-control Killing Fluid

I. Theory
Loss-control killing fluid can be utilized in LP wells (pressure coefficient ≤ 1.0). The killing fluid is made of macromolecule materials. Due to restriction to free water in system, it is not easy to generate filtration that penetrates into formation. Therefore, it can be used for LP wells with single pay zone or multi-pressure system pay zone.

II. Technical Features
No free liquid, no solid, good liquidity, easy to pump through, and convenient to run and pull BHAs
Medium-level viscosity, excellent solid carrying capacity
  It can form temporary sealing matrix at the surface of the pay zone to hold pressure.
  Safe and environmentally friendly
Easy to be mixed and handled

III. Performance Parameter
  Density: 1.00 g/cm³~1.03 g/cm³
  Viscosity : 30mPa.s~100mPa.s
  Temperature: Atmospheric temperature~140℃
  Stable Time:30 days

IV. Applications
Meet the requirements of work conditions for completions, testing, workover and FCO (Fills clean out) in LP wells (pressure coefficient ≤ 1.0):
Single zone operation: Leakage-proof
Multi-zone operation: Keep high pressure coefficient well under control and prevent leakage in low pressure coefficient well
Effectively perform operations such as sand removal, transforming flowing well into pump well, killing well, and workover.
Circulation can be setup in LP wells to perform sand removal operation.

Well No

Pressure coefficient

Well temperature

Amount

Time

Post-process

Discharge approach

Production

 

()

(m³)

(d)

 

 

Pre-operation

After-operation

A

0.4

30

35

1

no

pump

1.1×104m3

1.5×104m3

B

0.48

35

35

1

no

pump

1.1×104m3

1.3×104m3

C

0.55

60

45

1

no

pump

8(t)

12(t)

D

0.48

50

70

1

no

Pumping

1.8×104m3

1.9×104m3

 

 
 
 
AntonOil Copyright (c) 2006 all rights reserved